![]() |
PROJECT HIGHLIGHTS | BUILDING CONDITION/SEISMIC ASSESSMENT |
PROJECT NAME & LOCATION |
NATURE OF AllWest's RESPONSIBILITY |
CLIENT |
ACCOMPLISHMENTS |
|
Alpine Meadows, Lake Tahoe, CA (2007) |
Physical Needs and Seismic Review for 8 building, 644 acre ski resort. |
JMA Ventures, San Francisco, CA |
Provided qualitative evaluation and short and long term budgetary estimates for each structure of an internationally known ski resort. |
|
Luxury Hotel Portfolio (2007) |
Property Condition Reports on destination resorts hotels including the Ventana Inn (Big Sur) Beaver Creek Resort(Avon, CO) and Sonoma Mission Inn & Golf Course. |
Confidential |
Staffed a complex multi-site, multi-state high profile project with in-house licensed professionals. Provided qualitative evaluations and short and long term budgetary estimates for all sites within short time frame. Budgets utilized by both acquirer and lender. |
|
East Bay Apartment Complexes (2007) |
Design Seismic U pgrade |
The Felson Companies, Inc |
Working on a lump-sum basis, AllWest's structural upgrade improved seismic shear capacity for tucked under parking garages utilizing steel frames. |
|
Park Central Denver, CO (2006) |
Peer Review PCA Report and site inspection for Acquisition Due Diligence. |
Walton Street Capital Chicago, IL |
Identified $500,000 in parking garage repairs not disclosed by seller. |
|
Distribution Center Visalia, CA (2006) |
Seismic Assessment. |
Cottonwood Partners Salt Lake City, UT |
Identified poor seismic design and engineering with retrofit costs exceeding $1M. |
|
Downtown Retail, Tiburon, CA (2006) |
Physical Condition ADA report to 30 tenants in 28 buildings. |
Confidential |
Evaluated ADA compliance at multi building, many on the state and historic register prior to site disposition. |
|
San Francisco, CA (2005) |
Conduct physical condition needs assessment of 28 Building per HUD guidelines. |
PNC MultiFamily Capital San Francisco, CA |
Inspected 95% of units meeting lender guidelines and produced 37 year rehabilitation budget for site. |
|
Mt. View, CA (2005) |
Seismic Review 10 Building R & D office portfolio. |
Eagle Ridge Partners |
Assisted client in negotiation a seven figure fee reduction in sales price due to seismic issues. |
|
San Luis Obispo, CA (2005) |
Property Condition Assessment of Regional Power Center |
Lubert-Adler Los Angeles, CA |
Based on identified issues client received a six figure price reduction to address roof issues. |
|
Citicorp Center San Francisco, CA (2004) |
Conduct Architectural, MEP and Seismic Review of 43 story Class A office building. |
American Assets, San Diego, CA |
Mobilized in-house and outside consultants and provided evaluation over 7 day Christmas holiday period. |
|
Westgate Shopping Center San Leandro, CA (2003) |
Peer Review of Seismic Assessment |
ScanlanKemperBard Portland, OR |
Rebutted two high PML opinions through sophisticated structural analysis of 1954 industrial building. Enabled acquisition to proceed. |
|
Ford Motor Building San Leandro, CA (2003) |
Seismic PML Evaluation |
Orton Development Emeryville, CA |
Identified significant issue in seismic upgrade of historic Alfred Kahn building. Client petitioned city for additional development fees. |
|
Salinas Apartments Salinas, CA (2003) |
Property Construction and Seismic Assessments on 9 property 1700 apartment unit portfolio |
United Dominion Realty Trust Dallas, Texas |
Identified several critical physical deficiencies and 2 properties that required seismic upgrades. |
|
Office Building Los Angeles, CA (2002) |
Feasibility Study for Seismic Retrofit |
Barker - Pacific Properties Los Angeles, CA |
Retained to evaluate retrofit options to respond to high earthquake insurance fees. |
|
Office Park |
Property Condition & Seismic Assessment on 18 Building Portfolio |
PRES Newport Beach, CA |
Identified seismic and asbestos issues in 16 buildings glossed over by sellers consultant. |
|
Retail Center Mountain View, CA (2002) |
Seismic Retrofit of 4 Building Center |
DeAnza Properties Cupertino, CA |
Retained by property owner to design retrofit of buildings prompted by refinancing conditions. |
|
Jack's Restaurant San Francisco, CA (2001) |
Property Condition and Seismic Review. |
Deloitte & Touche Los Angeles, CA |
Identified seismic issues with the building that reduced purchase price of property by greater than $350,000. |
|
Century City Mall Los Angeles, CA (2001) |
Seismic Review of 13 building 850,000 square feet retail center. |
Miller Capital Advisory Chicago, IL |
Retained by pension fund advisor to provide analysis of lateral resistance capabilities of upscale regional mall buildings. |
|
San Jose, Salinas, San Francisco, and La Mirada, CA (2001) |
ALTA Surveys for Commercial Properties. |
Confidential |
Retained by securitized and life insurance lenders to provide boundary surveys. |
|
Victory Avenue South San Francisco, CA (2001) |
Designed seismic upgrade for 1960's vintage 200,000 square feet concrete industrial warehouse building. |
Sandhill Properties San Mateo, CA |
Retained by site owner to upgrade seismic elements of building thereby negating the need for earthquake insurance. |
|
2nd Street San Francisco, CA (2000 - 2001) |
Property Condition & Seismic Review of six story 1913 vintage building. Design of seismic upgrade of the building. |
Eiselman Group |
Client was purchasing what was thought to be a seismically upgraded building. Our review noted that although approved by the city, a brace frame along one side of the building was not structurally configured correctly. The $115,000 problem was resolved prior to the sale. |
|
Spreckels Warehouse Manteca, CA (2000) |
Budget & Seismic Design Review prior to monthly site inspections of 552,000 sf building constructed on 26 acre site. |
MetLife |
Client was purchasing project after construction. Retained AllWest to ensure conformance with design criteria & budget. |
|
2nd Street San Francisco, CA (2000) |
Property Condition & Seismic Review of six story 1913 vintage building. |
Eiselman Group |
Client was purchasing what was thought to be a seismically upgraded building. Our review noted that although approved by the city, a brace frame along one side of the building was not structurally configured coorectly. The $115,000 problem was resolved prior to the sale. |
|
Sutter, Bush & Pine Streets San Francisco, CA (2000) |
Seismic (PML) reviews on three 8 story, pre 1950's buildings. |
Heller Financial |
In response to client request completed written reports within 7 days. |
|
Park Center Plaza San Jose, CA (2000) |
ALTA Survey of 5 parcel, 6 acre city block in central downtown, San Jose. |
Confidential |
Initially retained by seller of property to map external boundary of complicated, irregular site. 2nd assignment for buyer to mark internal boundaries. Completed within 15 working days during Christmas-New Year period. |
|
Larkin Street, San Francisco, CA (1999) |
Acted as owner's agent replacing design engineer during construction of seismic upgrade of Ghiradelli Square building. |
The Snapdragon Group, Benecia, CA |
Managed seismic upgrade for occupied UMB. The primary tenant was a high-end art gallery. |
|
RIM Hotel Portfolio, Southern California (1999) |
Reviewed construction budgets and conducted periodic draw requests for Carlson Hotel conversions in Solvang, Port Hueneme, Camarillo, Ventura & Calabasas. |
Pacific Coast Capital Partners, Los Angeles, CA |
Reviews stimulated hotel company to better organize their construction budget process. |
|
Forbes Avenue, South San Francisco, CA (1999) |
Provided turnkey engineering and environmental due diligence services for local property developer. |
Sandhill Properties, San Mateo, CA |
After identifying expansion joint and foundation issues, provided engineering design and oversite services to correct problems. |
|
Stockton, CA (1999) |
Provided engineering expertise to Real Estate Consultant for initial feasibility review for the conversion of the Stockton Development Center to Cal. State University system use. |
Julian Studley, Washington, D.C. |
Responded within 24 hours to request to inspect 108 acre site and provide order of magnitude budget. |
|
Mixed Use Portfolio (1998) |
Conduct Probable Maximum Loss studies on 47 retail, office and industrial buildings in California, Oregon, Arizona, Washington and Colorado. |
Divco West, San Jose, CA |
Completed work within 35 days of authorization, peer review by rating agencies generated no comments. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HOME AllWest Environmental, Inc. 530 Howard Street, #300, San Francisco CA 94105 tel: 415/391-2510; 714/541-5303; fax: 415/391-2008; email: info@allwest1.com ©2000, 2004 AllWest Environmental, Inc. |